Download Price-list for Concrete
Download Price-list for Mixtures
Download Price-list for Service Station
- Concrete
- Construction Laboratory Services
- Mixtures
- Machinery Services
- Foundation Wall Blocks
- Carwash
- Office living container rental
- Helicopter landing site
- Vehicle service station for trucks, speciality equipment and cars
- Warehouse premises for rent
CONCRETE
Name |
Grade of concrete (in accordance with its strength) |
Class of concrete
|
Class of concrete
|
P3UAH/m3(inc. VAT) |
P4(for concrete pump)UAH/m3(inc. VAT) |
Ready-mixconcrete |
М-100 |
В-7,5 |
- | 2700.00 | 2720.00 |
М-150 |
В-12,5 |
С 10/12 | 2780.00 | 2790.00 | |
М-200 |
В-15 | С 12/15 | 2840.00 | 2870.00 | |
М-250 |
В-20 | С 16/20 | 2910.00 | 2950.00 | |
М-300 |
В-22,5 | С 18/22,5 | 3000.00 | 3030.00 | |
М-350 |
В-25 | С 20/25 | 3030.00 | 2820.00 |
|
М-400 |
В-30 | С 25/30 | 3120.00 | 3150.00 | |
М-450 |
В-35 | С 28/35 | 3220.00 | 3240.00 | |
Ready-mix concrete with extra waterproof properties |
М-250 |
В-20 | С 16/20 W6 | 3030.00 | 3060.00 |
М-350 |
В-25 | C 20/25 W6 | 3090.00 | 3120.00 | |
М-350 |
В-25 | C 20/25 W8 | 3140.00 | 3170.00 |
Under volume of purchase per a calendar month a discount on the concrete mixture will be:
- 30-70 m3 - 1%
- 71-150 m3 - 2%
- 151-200 m3 - 3%
- 201-1000 m3 - 4%
- More than 1000 m3 - 5%
- 1-5 km - 145,00 UAH/m3
- 6-10 km - 160,00 UAH/m3
- 11-15 km - 190,00 UAH/m3
- 16-20 km - 215,00 UAH/m3
- 21-25 km - 245,00 UAH/m3
- 26-30 km - 275,00 UAH/m3
- 31-35 km - 305,00 UAH/m3
- 36-40 km - 330,00 UAH/m3
- 41-45 km - 360,00 UAH/m3
- 46-50 km - 390,00 UAH/m3
Also, we can develop an individual prescription based on your requirements.
"Waitzinger" Concrete Pump Services (160m3/h; boom - 42 m):
- 25,000 UAH/shift (8 h) using concrete from Hi-Raise Constructions Holding.
Vehicle idle time for more than 60 min costs 180 UAH/h.
The cost of equipment feeding and removing costs 30 UAH per 1 km.
Concrete mixers of 6,7, 9, 10, 11 and 12 m3 deliver the concrete. The fleet contains 26 concrete mixers that allows delivering of 219 m3.
Construction Laboratory Services
№ |
Name of work |
Work Definition |
Price, UAH |
CONCRETE | |||
1 |
DSTU BV. 2.7-220:2009 Construction materials. Concretes. Strength evaluation with the mechanical nondestructive methods. |
Mechanical nondestructive methods. |
162,00 |
2 |
DSTU BV. 2.7-170:2008 Construction materials. Concretes. Methods to determine mass specific gravity, moisture, water absorption, void and water tightness. |
Rapid air permeability method to determine concrete water tightness. |
1050,00 |
3 |
DSTU BV. 2.7-214:2009 Construction materials. Concretes. Strength evaluation methods using test specimen. |
Test cube compression capacity. |
210,00 |
ARMATURE |
|||
4 |
DSTU BV. 2.6-168:2011 "Reinforced and fixed welded products, welded connections OF reinforcement and fixed products of reinforced concrete structures. |
Testing of welded joints of reinforcement for breaking. | 246,00 |
SOILS |
|||
5 |
DSTU BV. 2.1-17:2009 Footings and Foundations of establishments. Soils. Laboratory physical testing methods. |
Drying-out soil moisture measurement. | 222,00 |
6 |
DSTU BV. 2.1-17:2009 Footings and Foundations of establishments. Soils. Laboratory physical testing methods. |
"Cutting ring" density test. | 130,00 |
7 |
DSTU BV. 2.1-12:2009 Footings and Foundations of establishments. Soils. Compaction test. |
Abbot compaction test. | 552,00 |
8 |
DSTU BV. 2.1-12:2009 Footings and Foundations of establishments. Soils. Compaction test. |
Compaction test with natural moisture content. | 336,00 |
CEMENT |
|||
9 |
DSTU B V.2.7-185:2009 "Cements. Determination of normal density, timing of setting and sounding of cement." | Cement normal consistency test. | 444,00 |
10 |
DSTU B V.2.7-185:2009 "Cements. Determination of normal density, timing of setting and sounding of cement." | Cement setting time test. | 636,00 |
11 |
DSTU B V.2.7-188:2009 "Cements. Determination of fineness of cement." | Fineness of cement test. | 168,00 |
AGGREGATES | |||
12 |
DSTU BV. 2.7-71-97. Gravel chippings and gravel from solid-solid and industrial production waste for construction works. Methods of physical and mechanical tests. | Grain size composition | 432,00 |
Dusty and clay particles content | 504,00 | ||
Clay content in lumps | 390,00 | ||
Packed density | 222,00 | ||
13 |
4 DSTU B V.2.7-232:2010 "Sand for construction works. Test methods." | Grain size composition and fineness modulus | 432,00 |
Dusty and clay particles content | 504,00 | ||
Packed density | 222,00 | ||
Moisture | 222,00 | ||
Clay content in lumps | 390,00 |
*The cost of delivery by the Contractor vehicle is 8.46 UAH per 1 km, including VAT.
If the way takes more than 40 min to the object, hourly rate for the operators services are added to the delivery cost.
Mixtures
Mixture |
UAH/m3 (inc. VAT) |
М-75 | 3010.00 |
М-100 | 3110.00 |
М-150 | 3160.00 |
М-200 | 3210.00 |
Under volume of purchase per a calendar month a discount on the concrete mixture will be:
- 30-70 m3 - 1%
- 71-150 m3 - 2%
- 151-200 m3 - 3%
- 201-1000 m3 - 4%
- More than 1000 m3 - 5%
- 1-5 km - 145,00 UAH/m3
- 6-10 km - 160,00 UAH/m3
- 11-15 km - 190,00 UAH/m3
- 16-20 km - 215,00 UAH/m3
- 21-25 km - 245,00 UAH/m3
- 26-30 km - 275,00 UAH/m3
- 31-35 km - 305,00 UAH/m3
- 36-40 km - 330,00 UAH/m3
- 41-45 km - 360,00 UAH/m3
- 46-50 km - 390,00 UAH/m3
Also, we can develop an individual prescription based on your requirements.
"Waitzinger" Concrete Pump Services (160m3/h; boom - 42 m):
- 28,000 UAH/cm using concrete from Hi-Raise Constructions Holding.
The cost of equipment feeding and removing costs 30 UAH per 1 km.
Concrete mixers of 6,7,10 and 12 m3 deliver the concrete
The fleet contains 26 concrete mixers that allow delivering of 219 m3.
MACHINERY SERVICES
№ |
Equipment |
Characteristics |
Price per
|
Price per
|
1 |
KamAZ Dumptrucks (65120, 65115, 5511)
|
Loading capacity - 20 tons, body length - 4.5 m | 3600,00 | 450,00 |
15 tons, body length - 3.5 m | 3600,00 | 450,00 | ||
2 |
KamAZ mixers -581462 (103315) |
Agitator body volume - 6 m3 | negotiated | - |
MAN TGA mixers |
Agitator body volume - 7 m3 | negotiated | - | |
Mercedes-Benz mixers |
Agitator body volume - 12 m3 | negotiated | - | |
3 |
Putzmeister SA 1407-D Concrete Pump |
Diesel stationary pump 115 kW, capacity -71 m3, working pressure up to 106 bars | 7500,00 | 937,50 |
4 |
Waitzinger Concrete Pump |
Rubber tyred concrete pump, capacity - 160 m3, boom - 42 m | 28000,00 | - |
5 |
Mobile cranes
|
КТА - 16 (16 tons), boom - 15.3 m | 4800,00 | 475,00 |
Demag - 25 (25 tons), boom - 25 m | 4800,00-5500,00 | 600,00-687,50 | ||
МКТ crane (25 tons), boom - 21.7 m | 4800,00-5500,00 | 600,00-687,50 | ||
6 |
MKG-25 BR Crane (crawler) |
25 tons, boom - 25.7-28.5 m | 3000,00 | 375,00 |
7 |
RDK-300 Crane (crawler) |
30 tons, boom - 25.5 m | 3000,00 | 375,00 |
8 |
Demag Crane (crawler) |
32 tons, boom - 27 m | negotiated | negotiated |
9 |
Liebherr Litronic А 904 Excavator (21 tons) |
Rubber tyred excavator; power 99 kW, bucket capacity - 0.68-0.96 m3, dig depth - 5.6 m | 7500,00 | 937,50 |
10 |
Liebherr R 914 Excavator (22 tons) |
Crawler excavator; power - 99 kW, bucket capacity - 1.14 m3, dig depth - 6.20 m | 7500,00 | 937,50 |
11 |
KOMATSU Excavator (2 tons) |
Bucket capacity - 0.02 m3, dig depth - 2.5 m | 4000,00 | 500,00 |
12 |
KOBELKO mini-excavator (7,6 tons) |
Crawler excavator, dig depth - 3.4 m, bucket capacity - 0.2 m3 | 4000,00 | 500,00 |
13 |
JCB excavator-loader |
Wheel mounted, front bucket - 1.5 m, back bucket - 0.6 m3 | 5000,00 | 625,00 |
14 |
Liebherr Litronic А 904 excavator with hammer (21 tons) |
Rubber tyred excavator; power - 99 kW | 7500,00-8500,00 | 937,50-1062,50 |
15 |
Heavy Vehicles Trailer |
Loading capacity - 40 tons, overall length - 13 m, board length - 4.6 m, board height - 0.55 m | negotiated | negotiated |
16 |
ВОВСАТ Mini loader |
Wheel mounted; Width - 1.5 m, bucket - 0.2 m3 | 3500,00-4000,00 | 437,50-500,00 |
17 |
AMMANN AV 26 Vibratory compactor |
Flat, 3.5 tons, packing depth 30-50 сm | 3500,00-4000,00 | 437,50-500,00 |
18 |
HAMM 3012 DS Vibratory compactor |
Hedgehog vibratory compactor, 7.5 tons, packing depth - 40-60 сm | 5500,00-6000,00 | 687,50-750,00 |
19 |
BOMAG Vibratory compactor |
Flat, 3.5 tons, packing depth - 30-50 сm | 5500,00 | 687,50 |
20 |
PKCD 5.25D Compressor |
With two hammers | negotiated | negotiated |
21 |
Semitrailer truck Mercedes Dump truck MENCI 335 |
Loading capacity - 40 tons, body length - 7.6 m | negotiated | negotiated |
22 |
Street washer ZIL 432932 |
Capacity - 6 m3 of water | negotiated | negotiated |
23 |
Open tilt-covered vehicle MAZ |
Loading capacity - 5 tons, body length - 6 m | negotiated | negotiated |
A washbay for special vehicles and freight transport was opened at the engineering and manufacturing base offering the following services:
- touchless washing;
- cleaning of car interiors;
- cleaning of cat trunk.
Vehicle service station is also offered.
More information by phone +38 048 777 11 77
Manager: +38 (067) 517-97-51
Address: 9, Vynokurova st., v. Malodolynske, city of Chornomorsk.
Vehicles running for more than 8 hours and/or more than 140 km for wheeled vehicles
should be paid for overtime of vehicles running and/or for excess running for wheeled vehicles.
Sales department: +38 048 777 11 77
FOUNDATION WALL BLOCKS
№ |
Wall Blocks |
UAH/pc |
1 |
Foundation Wall Blocks 24.3.6 | 600,00 |
2 |
Foundation Wall Blocks 24.4.6 | 650,00 |
3 |
Foundation Wall Blocks 24.5.6 | 750,00 |
4 |
Foundation Wall Blocks 24.6.6 | 850,00 |
CAR WASH
OFFICE LIVING CONTAINER RENTAL
№ |
Description |
Price, UAH |
1 |
Living container rental, 1 month | 6000,00 |
2 |
Office container rental (for engineering-technical workers), 1 month | 8000,00 |
HELICOPTER LANDING SITE
№ |
Description |
Price, UAH |
1 |
Landing | 2500,00 |
2 |
Takeoff of a helicopter | 2500,00 |
3 |
Parking under guard | 5000,00 |
VEHICLE SERVICE STATION FOR TRUCKS, SPECIALTY EQUIPMENT AND CARSCE STATION
№ |
Description |
Price,UAH. |
Maintenance Work |
||
1 |
Engine, oil and filter change | 472,50 |
2 |
Coolant, change | 375,00 |
3 |
Gearbox oil filter, change | 375,00 |
4 |
Axle gearbox oil filter, change | 150,00 |
5 |
Fuel filter, change (second) | 75,00 |
6 |
Fuel filter, change (first) | 187,50 |
7 |
Fuel filter separator, filter element change | 225,00 |
8 |
Air filter, change | 75,00 |
9 |
Cabin filter, change | 45,00 |
10 |
Dehumidifier filter, change |
187,50 |
11 |
Centrifuge filter, change (cleaning) | 225,00 |
12 |
Rear axle carter, oil change | 375,00 |
13 |
Oil change in the front rear axle carter | 375,00 |
14 |
Gearbox, oil change | 375,00 |
15 |
Brake pads, change (rear axle) |
1350,00 |
16 |
Brake pads, change (front stationary axle) |
600,00 |
17 |
Brake pads, removal and installation (drum brakes) |
225,00 |
18 |
Rear spring, change | 2250,00 |
19 |
Front spring, change | 1839,00 |
20 |
Spring, leaf change | 300,00 |
Tire fitting with materials |
||
1 |
Removal and installation of a wheel on a nave | 96,00 |
2 |
Wheel disassembly and assembly of the | 96,00 |
3 |
Wheel swap | 12,00 |
4 |
Wheel balance | 216,00 |
5 |
Universal Repair Patch UP-8 | 75,00 |
6 |
RAD-Patch 110ТL | 126,00 |
7 |
RAD-Patch 115ТL | 162,00 |
8 |
RAD-Patch 120ТL | 330,00 |
9 |
RAD-Patch 125ТL | 696,00 |
10 |
RAD-Patch 140ТL | 714,00 |
11 |
RAD-Patch 142ТL | 1062,00 |
12 |
RAD-Patch 145ТL | 1440,00 |
13 |
Plastic power extender | 54,00 |
14 |
Metal power extender | 120,00 |
15 |
Load valve | 132,00 |