Download Price-list for Concrete
Download Price-list for Mixtures
Download Price-list for Service Station

  1. Concrete
  2. Construction Laboratory Services
  3. Mixtures
  4. Machinery Services
  5. Foundation Wall Blocks
  6. Carwash
  7. Office living container rental
  8. Helicopter landing site
  9. Vehicle service station for trucks, speciality equipment and cars
  10. Warehouse premises for rent 

CONCRETE

Name
Grade of concrete (in accordance with its strength)
Class of concrete
in accordance with
DSTU BV.2.7-43-96
Class of concrete
in accordance with
DSTU BV.2.7-176:2008
P3
UAH/m3
(inc. VAT)
P4
(for concrete pump)
UAH/m3
(inc. VAT)
Ready-mix
concrete
М-100

В-7,5

- 2700.00 2720.00
М-150

В-12,5

С 10/12 2780.00 2790.00
М-200
В-15 С 12/15 2840.00 2870.00
М-250
В-20 С 16/20 2910.00 2950.00
М-300
В-22,5 С 18/22,5 3000.00 3030.00
М-350
В-25 С 20/25 3030.00 2820.00
М-400
В-30 С 25/30 3120.00 3150.00
М-450
В-35 С 28/35 3220.00 3240.00
Ready-mix concrete with extra waterproof properties
М-250
В-20 С 16/20 W6 3030.00 3060.00
М-350
В-25 C 20/25 W6 3090.00 3120.00
М-350
В-25 C 20/25 W8 3140.00 3170.00

Under volume of purchase per a calendar month a discount on the concrete mixture will be:

  • 30-70 m3 - 1%
  • 71-150 m3 - 2%
  • 151-200 m3 - 3%
  • 201-1000 m3 - 4%
  • More than 1000 m3 - 5%

                  Delivery

  • 1-5 km - 145,00 UAH/m3
  • 6-10 km - 160,00 UAH/m3
  • 11-15 km - 190,00 UAH/m3
  • 16-20 km - 215,00 UAH/m3
  • 21-25 km - 245,00 UAH/m3
  • 26-30 km - 275,00 UAH/m3
  • 31-35 km - 305,00 UAH/m3
  • 36-40 km - 330,00 UAH/m3
  • 41-45 km - 360,00 UAH/m3
  • 46-50 km - 390,00 UAH/m3

Also, we can develop an individual prescription based on your requirements.

"Waitzinger" Concrete Pump Services (160m3/h; boom - 42 m):
- 25,000 UAH/shift (8 h) using concrete from Hi-Raise Constructions Holding.
Vehicle idle time for more than 60 min costs 180 UAH/h.

The cost of equipment feeding and removing costs 30 UAH per 1 km.

Concrete mixers of 6,7, 9, 10, 11 and 12 m3 deliver the concrete. The fleet contains 26 concrete mixers that allows delivering of 219 m3.

                  Construction Laboratory Services

Name of work
Work Definition
Price, UAH
  CONCRETE    
1

DSTU BV. 2.7-220:2009 Construction materials. Concretes. Strength evaluation with the mechanical nondestructive methods.

Mechanical nondestructive methods.

162,00
2

DSTU BV. 2.7-170:2008 Construction materials. Concretes. Methods to determine mass specific gravity, moisture, water absorption, void and water tightness.

Rapid air permeability method to determine concrete water tightness.

1050,00
3

DSTU BV. 2.7-214:2009 Construction materials. Concretes. Strength evaluation methods using test specimen.

Test cube compression capacity.
210,00
 

ARMATURE

   
4

DSTU BV. 2.6-168:2011 "Reinforced and fixed welded products, welded connections OF reinforcement and fixed products of reinforced concrete structures.

Testing of welded joints of reinforcement for breaking. 246,00
 

SOILS

   
5

DSTU BV. 2.1-17:2009 Footings and Foundations of establishments. Soils. Laboratory physical testing methods.

Drying-out soil moisture measurement. 222,00
6

DSTU BV. 2.1-17:2009 Footings and Foundations of establishments. Soils. Laboratory physical testing methods.

"Cutting ring" density test. 130,00
7

DSTU BV. 2.1-12:2009 Footings and Foundations of establishments. Soils. Compaction test.

Abbot compaction test. 552,00
8

DSTU BV. 2.1-12:2009 Footings and Foundations of establishments. Soils. Compaction test.

Compaction test with natural moisture content. 336,00
 

CEMENT

   
9
DSTU B V.2.7-185:2009 "Cements. Determination of normal density, timing of setting and sounding of cement." Cement normal consistency test. 444,00
10
DSTU B V.2.7-185:2009 "Cements. Determination of normal density, timing of setting and sounding of cement." Cement setting time test. 636,00
11
DSTU B V.2.7-188:2009 "Cements. Determination of fineness of cement." Fineness of cement test. 168,00
  AGGREGATES    
12
DSTU BV. 2.7-71-97. Gravel chippings and gravel from solid-solid and industrial production waste for construction works. Methods of physical and mechanical tests. Grain size composition 432,00
Dusty and clay particles content 504,00
Clay content in lumps 390,00
Packed density 222,00
13
4 DSTU B V.2.7-232:2010 "Sand for construction works. Test methods." Grain size composition and fineness modulus 432,00
Dusty and clay particles content 504,00
Packed density 222,00
Moisture 222,00
Clay content in lumps 390,00

*The cost of delivery by the Contractor vehicle is 8.46 UAH per 1 km, including VAT.
If the way takes more than 40 min to the object, hourly rate for the operators services are added to the delivery cost.

Mixtures

Mixture
UAH/m3 (inc. VAT)
М-75 3010.00
М-100 3110.00
М-150 3160.00
М-200 3210.00

Under volume of purchase per a calendar month a discount on the concrete mixture will be:

  • 30-70 m3 - 1%
  • 71-150 m3 - 2%
  • 151-200 m3 - 3%
  • 201-1000 m3 - 4%
  • More than 1000 m3 - 5%

                  Delivery

  • 1-5 km - 145,00 UAH/m3
  • 6-10 km - 160,00 UAH/m3
  • 11-15 km - 190,00 UAH/m3
  • 16-20 km - 215,00 UAH/m3
  • 21-25 km - 245,00 UAH/m3
  • 26-30 km - 275,00 UAH/m3
  • 31-35 km - 305,00 UAH/m3
  • 36-40 km - 330,00 UAH/m3
  • 41-45 km - 360,00 UAH/m3
  • 46-50 km - 390,00 UAH/m3

Also, we can develop an individual prescription based on your requirements.
"Waitzinger" Concrete Pump Services (160m3/h; boom - 42 m):
- 28,000 UAH/cm using concrete from Hi-Raise Constructions Holding.

The cost of equipment feeding and removing costs 30 UAH per 1 km.

Concrete mixers of 6,7,10 and 12 m3 deliver the concrete

The fleet contains 26 concrete mixers that allow delivering of 219 m3.

MACHINERY SERVICES

Equipment
Characteristics
Price per
m/shift (UAH inc. VAT)
Price per
m/hour (UAH inc. VAT)
1
 

KamAZ Dumptrucks (65120, 65115, 5511)

 

Loading capacity - 20 tons, body length - 4.5 m 3600,00 450,00
15 tons, body length - 3.5 m 3600,00 450,00
2

KamAZ mixers -581462 (103315)

Agitator body volume - 6 m3 negotiated -

MAN TGA mixers

Agitator body volume - 7 m3 negotiated -

Mercedes-Benz mixers

Agitator body volume - 12 m3 negotiated -
3

Putzmeister SA 1407-D Concrete Pump

Diesel stationary pump 115 kW, capacity -71 m3, working pressure up to 106 bars 7500,00 937,50
4

Waitzinger Concrete Pump

Rubber tyred concrete pump, capacity - 160 m3, boom - 42 m 28000,00 -
5
 
 

 

Mobile cranes

 

КТА - 16 (16 tons), boom - 15.3 m 4800,00 475,00
Demag - 25 (25 tons), boom - 25 m 4800,00-5500,00 600,00-687,50
МКТ crane (25 tons), boom - 21.7 m 4800,00-5500,00 600,00-687,50
6

MKG-25 BR Crane (crawler)

25 tons, boom - 25.7-28.5 m 3000,00 375,00
7

RDK-300 Crane (crawler)

30 tons, boom - 25.5 m 3000,00 375,00
8

Demag Crane (crawler)

32 tons, boom - 27 m negotiated negotiated
9

Liebherr Litronic А 904 Excavator (21 tons)

Rubber tyred excavator; power 99 kW, bucket capacity - 0.68-0.96 m3, dig depth - 5.6 m 7500,00 937,50
10

Liebherr R 914 Excavator (22 tons)

Crawler excavator; power - 99 kW, bucket capacity - 1.14 m3, dig depth - 6.20 m 7500,00 937,50
11

KOMATSU Excavator (2 tons)

Bucket capacity - 0.02 m3, dig depth - 2.5 m 4000,00 500,00
12

KOBELKO mini-excavator (7,6 tons)

Crawler excavator, dig depth - 3.4 m, bucket capacity - 0.2 m3 4000,00 500,00
13

JCB excavator-loader

Wheel mounted, front bucket - 1.5 m, back bucket - 0.6 m3 5000,00 625,00
14

Liebherr Litronic А 904 excavator with hammer (21 tons)

Rubber tyred excavator; power - 99 kW 7500,00-8500,00 937,50-1062,50
15

Heavy Vehicles Trailer

Loading capacity - 40 tons, overall length - 13 m, board length - 4.6 m, board height - 0.55 m negotiated negotiated
16

ВОВСАТ Mini loader

Wheel mounted; Width - 1.5 m, bucket - 0.2 m3 3500,00-4000,00 437,50-500,00
17

AMMANN AV 26 Vibratory compactor

Flat, 3.5 tons, packing depth 30-50 сm 3500,00-4000,00 437,50-500,00
18

HAMM 3012 DS Vibratory compactor

Hedgehog vibratory compactor, 7.5 tons, packing depth - 40-60 сm 5500,00-6000,00 687,50-750,00
19

BOMAG Vibratory compactor

Flat, 3.5 tons, packing depth - 30-50 сm 5500,00 687,50
20

PKCD 5.25D Compressor

With two hammers negotiated negotiated
21

Semitrailer truck Mercedes Dump truck MENCI 335

Loading capacity - 40 tons, body length - 7.6 m negotiated negotiated
22

Street washer ZIL 432932

Capacity - 6 m3 of water negotiated negotiated
23

Open tilt-covered vehicle MAZ

Loading capacity - 5 tons, body length - 6 m negotiated negotiated

A washbay for special vehicles and freight transport was opened at the engineering and                   manufacturing base offering the following services:

  • touchless washing;
  • cleaning of car interiors;
  • cleaning of cat trunk.

Vehicle service station is also offered.
More information by phone +38 048 777 11 77
Manager: +38 (067) 517-97-51
Address: 9, Vynokurova st., v. Malodolynske, city of Chornomorsk.
Vehicles running for more than 8 hours and/or more than 140 km for wheeled vehicles
should be paid for overtime of vehicles running and/or for excess running for wheeled vehicles.
Sales department: +38 048 777 11 77

FOUNDATION WALL BLOCKS

Wall Blocks
UAH/pc
1
Foundation Wall Blocks 24.3.6 600,00
2
Foundation Wall Blocks 24.4.6 650,00
                  3
Foundation Wall Blocks 24.5.6 750,00
4
Foundation Wall Blocks 24.6.6 850,00

CAR WASH

Description
Vehicle
Price, UAH
1
Touchless washing (with wiping the car body) Tented trailer, grain carrier with capacity of 20-30 tons 450,00
2
Touchless washing (without wiping the car body) Truck / passenger transport with capacity of 5 tons 230,00
Truck / passenger transport with capacity of 5-10 tons 280,00
                  Truck/passenger transport with capacity of 10-20 tons 330,00
Container truck 400,00
Bobtail 250,00
       

OFFICE LIVING CONTAINER RENTAL

Description
Price, UAH
1
Living                   container rental, 1 month 6000,00
2
Office container rental (for engineering-technical workers), 1 month 8000,00

HELICOPTER LANDING SITE

Description
Price, UAH
1
Landing 2500,00
2
Takeoff of a helicopter 2500,00
3
Parking under guard 5000,00

VEHICLE SERVICE STATION  FOR TRUCKS, SPECIALTY EQUIPMENT AND CARSCE STATION

Description
Price,UAH.
Maintenance Work
1
Engine, oil and filter change 472,50
2
Coolant, change 375,00
3
Gearbox oil filter, change 375,00
4
Axle gearbox oil filter, change 150,00
5
Fuel filter, change (second) 75,00
6
Fuel filter, change (first) 187,50
7
Fuel filter separator, filter element change 225,00
8
Air filter, change 75,00
9
Cabin filter, change 45,00
10
Dehumidifier filter, change
187,50
11
Centrifuge filter, change (cleaning) 225,00
12
Rear axle carter, oil change 375,00
13
Oil change in the front rear axle carter 375,00
14
Gearbox, oil change 375,00
15
Brake pads, change (rear axle)
1350,00
16
Brake pads, change (front stationary axle)
600,00
17
Brake pads, removal and installation (drum brakes)
225,00
18
Rear spring, change 2250,00
19
Front spring, change 1839,00
20
Spring, leaf change 300,00
Tire fitting with materials
1
Removal and installation of a wheel on a nave 96,00
2
Wheel disassembly and assembly of the 96,00
3
Wheel swap 12,00
4
Wheel balance 216,00
5
Universal Repair Patch UP-8 75,00
6
RAD-Patch 110ТL 126,00
7
RAD-Patch 115ТL 162,00
8
RAD-Patch 120ТL 330,00
9
RAD-Patch 125ТL 696,00
10
RAD-Patch 140ТL 714,00
11
RAD-Patch 142ТL 1062,00
12
RAD-Patch 145ТL 1440,00
13
Plastic power extender 54,00
14
Metal power extender   120,00
15
Load valve 132,00

                  WAREHOUSE PREMISES FOR RENT

Warehouse premises for rent - for non-explosive and non-flammable group of commodity goods.Total area is 1,200 m2. Rent of any area at tenant's request is possible.